Local Law 11 / FISP Sidewalk Shed Support in the Bronx

Protective Structures for Buildings Under Facade Inspection

If your building falls under NYC's Facade Inspection & Safety Program, commonly associated with Local Law 11, its exterior walls and appurtenances must undergo periodic inspection. When an inspection identifies an unsafe condition, public protection may be required while corrective work is completed.

Bronx Sidewalk Shed and Scaffolding supports property owners through this part of the process with installation, maintenance, and removal coordination aligned with the facade repair schedule. A Qualified Exterior Wall Inspector (QEWI) determines the facade classification and identifies required protection.

Talk to Our Compliance Team →
Local Law 11 / FISP Sidewalk Shed Support in the Bronx: green steel sidewalk shed with lighting along a tan brick apartment building as a pedestrian walks underneath

How FISP / Local Law 11 Affects Your Building

The Inspection Cycle

Buildings higher than six stories are subject to recurring facade inspections under FISP. The current requirement calls for exterior walls and appurtenances to be inspected every five years, with a technical report filed through DOB NOW: Safety. A QEWI performs the critical examination and classifies the exterior as:

  1. Safe
  2. Safe With a Repair and Maintenance Program
  3. Unsafe

When a Sidewalk Shed Becomes Required

An Unsafe classification can require immediate public protection, such as a sidewalk shed, fence, or structural netting, while the hazardous condition is addressed. The specific protection depends on the conditions identified by the QEWI and applicable DOB requirements.

Coordinating With Your FISP Filing

We coordinate installation and maintenance around the engineer's inspection findings and the repair schedule. Once the underlying work is complete and the facade can be cleared through the appropriate inspection and filing process, we can coordinate taking down the temporary protection.

Staying Ahead of the Repair Timeline

A facade repair schedule can extend beyond the initial inspection. Keeping the required protection in place while work progresses helps maintain pedestrian safety until the underlying condition has been addressed.

We coordinate installation, maintenance, and eventual removal around the project's actual progress rather than treating every building the same way. This can help property owners keep the temporary structure aligned with the repair timeline and applicable authorization requirements.

We support FISP-related work throughout the Bronx, including Riverdale, Kingsbridge, Fordham, and surrounding areas.

Need help coordinating the permit side as well?

See our full Sidewalk Shed services → for installation, maintenance, and related support.

Request a Compliance Review →
Long pipe scaffolding sidewalk shed with overhead deck and string lighting running along a city block next to a glass-front building

Bronx FISP Sidewalk Shed Checklist

Before facade repair work begins, property owners and project teams should confirm that the required public protection is planned, installed, and maintained for the full repair period.

  • Confirm the FISP finding: Review the latest facade inspection report and identify the areas requiring repair or public protection.
  • Coordinate with the QEWI: Confirm the protection needs with the Qualified Exterior Wall Inspector and project team.
  • Review the building and sidewalk: Account for building height, facade conditions, sidewalk width, entrances, storefronts, pedestrian traffic, and available work space.
  • Plan the protection system: Determine where a sidewalk shed, fence, netting, or other temporary protection is needed based on the site conditions and repair scope.
  • Coordinate with the repair contractor: Align the protection layout with scaffold access, material handling, work zones, deliveries, and repair sequencing.
  • Address entrances and pedestrian routes: Keep required access routes usable while protecting occupants, pedestrians, and workers around active repair areas.
  • Confirm required filings and permits: Make sure the necessary DOB submissions and authorizations are addressed before installation or continued use.
  • Inspect and maintain the structure: Check the protection system throughout the project and address damage, changes, or site conditions that affect its safe use.
  • Track repair progress: Keep the protection coordinated with the actual facade work so it can remain in place for as long as the project requires.
  • Plan removal: Once the facade work and required approvals are complete, coordinate removal with the project team and confirm that no remaining condition requires public protection.

Frequently Asked Questions

FISP is NYC's Facade Inspection & Safety Program. Under the current requirements, owners of buildings higher than six stories must have exterior walls and appurtenances inspected every five years and submit a technical facade report through DOB NOW: Safety. Local Law 11 is the law associated with these facade inspection requirements.

The current program generally applies to buildings higher than six stories. DOB states that the owner is ultimately responsible for determining whether the property is subject to the program, and a qualified design professional can help confirm the building's filing requirements and status.

No. A protective structure is associated with conditions requiring public protection, particularly an Unsafe facade classification. DOB identifies options that can include a sidewalk shed, fence, or structural netting, depending on the circumstances.

There is no fixed duration for every project. It depends on the extent of the facade work, repair progress, required inspections, and the process for clearing the unsafe condition. DOB requires unsafe conditions to be addressed within the applicable timeframe, and once the work is complete, the owner must complete the required amended filing process.

Yes. We work directly with your building's design professional or Qualified Exterior Wall Inspector (QEWI). We cross-reference our equipment engineering drawings with the official FISP technical report to ensure the protective shed footprint covers the exact hazard zones identified during the critical examination.

If repairs stall, the shed must remain in place to protect the public, but it will trigger the DOB's aggressive long-standing shed penalties. Under the 2026 rules, you must manually renew the permit every 90 days, pay the $90 progress fee, and provide documented proof of why the repairs are delayed. We provide comprehensive permit tracking and documentation support to help you navigate these strict compliance reviews.

Your Building Has an Unsafe Facade Condition?

We can help coordinate the temporary protection required while corrective work moves forward, from installation and maintenance to eventual removal.

Request FISP Support →